
For Chicago Property Managers
Per-Unit Dryer Vent Compliance for Chicago Property Portfolios
Stop relying on a vendor who hands you a one-line invoice. We deliver per-unit PDF reports with airflow measurements, borescope photos, and CO readings — the documentation your owners, insurers, and city inspectors actually accept.
<35ft
Code Equivalent Length
FPM
Measured, Not Estimated
Per Unit, Always
1 POC
For Your Whole Portfolio
Why generic vent companies fail you
No paper trail per unit
Most cleaners give you one invoice for 40 units. When a fire marshal or insurer asks for unit 3B's last service, you're guessing.
No measurements, just labor
Without pre/post airflow in FPM, you cannot prove the vent was actually restored — only that someone showed up with a brush.
Code blind spots
Chicago 18-28-504 and IRC M1502 require <35 ft equivalent length, rigid metal, and a working backdraft damper. Routine cleaners rarely check, let alone document.
What you receive
Every visit produces a defensible paper trail — not a verbal "looks good."
- One PDF audit report per unit with unit number, address, and date stamped on every page
- Pre-clean and post-clean anemometer readings (FPM) at the exterior hood
- Manometer back-pressure reading (in. w.c.) — proves restored airflow, not just visible lint
- Borescope photos of the duct interior at 4 ft, midpoint, and termination
- Carbon monoxide reading at the vent outlet for every gas dryer
- IRC M1502 + Chicago 18-28-504 compliance checklist with Pass / Caution / Fail verdict
- Annual portfolio rollup spreadsheet for board meetings and insurance renewals
- Single point of contact, scheduled access windows, and tenant-facing notices on request
Built on Chicago 18-28-504 and IRC M1502.
Request a portfolio quote
Frequently asked questions
Do you offer volume pricing for portfolios over 20 units?+
Yes. Pricing scales with unit count and access logistics. Send us your portfolio size and we will return a per-unit rate within one business day.
Can you coordinate tenant access notices?+
Yes. We provide a 48-hour notice template you can send through your tenant portal, and we work in scheduled blocks to minimize disruption.
What if a unit fails the inspection?+
The audit report flags it Caution or Fail with specific code references and photos. You get a remediation scope and quote. We do not upsell repairs we cannot document a need for.
Do you handle high-rise rooftop terminations?+
Yes. We carry harness/PPE for rooftop work and document hood condition, screen presence, and damper function with photos.
Can you bill the building, not the tenant?+
Yes. Standard for property management contracts. We invoice per portfolio cycle with a line item per unit.