V

VentHealth Pro

Technician inspecting dryer vent in a Chicago multi-unit building

For Chicago Property Managers

Per-Unit Dryer Vent Compliance for Chicago Property Portfolios

Stop relying on a vendor who hands you a one-line invoice. We deliver per-unit PDF reports with airflow measurements, borescope photos, and CO readings — the documentation your owners, insurers, and city inspectors actually accept.

<35ft

Code Equivalent Length

FPM

Measured, Not Estimated

PDF

Per Unit, Always

1 POC

For Your Whole Portfolio

Why generic vent companies fail you

No paper trail per unit

Most cleaners give you one invoice for 40 units. When a fire marshal or insurer asks for unit 3B's last service, you're guessing.

No measurements, just labor

Without pre/post airflow in FPM, you cannot prove the vent was actually restored — only that someone showed up with a brush.

Code blind spots

Chicago 18-28-504 and IRC M1502 require <35 ft equivalent length, rigid metal, and a working backdraft damper. Routine cleaners rarely check, let alone document.

What you receive

Every visit produces a defensible paper trail — not a verbal "looks good."

  • One PDF audit report per unit with unit number, address, and date stamped on every page
  • Pre-clean and post-clean anemometer readings (FPM) at the exterior hood
  • Manometer back-pressure reading (in. w.c.) — proves restored airflow, not just visible lint
  • Borescope photos of the duct interior at 4 ft, midpoint, and termination
  • Carbon monoxide reading at the vent outlet for every gas dryer
  • IRC M1502 + Chicago 18-28-504 compliance checklist with Pass / Caution / Fail verdict
  • Annual portfolio rollup spreadsheet for board meetings and insurance renewals
  • Single point of contact, scheduled access windows, and tenant-facing notices on request

Built on Chicago 18-28-504 and IRC M1502.

Request a portfolio quote

We'll never share your info. Reply within 1 business day.

Frequently asked questions

Do you offer volume pricing for portfolios over 20 units?+

Yes. Pricing scales with unit count and access logistics. Send us your portfolio size and we will return a per-unit rate within one business day.

Can you coordinate tenant access notices?+

Yes. We provide a 48-hour notice template you can send through your tenant portal, and we work in scheduled blocks to minimize disruption.

What if a unit fails the inspection?+

The audit report flags it Caution or Fail with specific code references and photos. You get a remediation scope and quote. We do not upsell repairs we cannot document a need for.

Do you handle high-rise rooftop terminations?+

Yes. We carry harness/PPE for rooftop work and document hood condition, screen presence, and damper function with photos.

Can you bill the building, not the tenant?+

Yes. Standard for property management contracts. We invoice per portfolio cycle with a line item per unit.